Camden Compliance Requirements

Complete guide to supported living and HMO compliance in Camden. Covers licensing, property standards, required documents, fees, and timelines.

Pop. 220,000|Updated 2026-02-27|Council website →
2Licence Types
10Docs Required
Contact council for current fees — under consultation for 2025 renewalHMO Fee

Licensing Requirements

Mandatory HMO

Required

Additional HMO

Required

Borough-wide additional licensing scheme covering HMOs with 3+ persons from 2+ households. Current scheme expires 8 December 2025.

Selective Licensing

Not active

Article 4 Direction

Not in place

Check with planning department for specific area requirements

Exempt Accommodation

Supported accommodation may be exempt under Housing Act 2004 s254/s257. Council assesses on case-by-case basis.

Property Standards

Minimum Room Sizes

single bedroom: 6.51 sqm (1 person). Rooms <6.51m² must be vacated within 18 months.
double bedroom: 10.22 sqm (2 persons). Rooms <10.22m² for 2 persons reduced to 1 within 18 months.
kitchen: Adequate for number of occupants
living room: Required for larger HMOs

Fire Safety Requirements

  • Smoke alarms on every floor
  • Heat detectors in kitchens
  • Fire doors on escape routes (FD30)
  • Fire risk assessment required
  • Fire safety equipment
  • Clear escape routes

Required Certificates

Gas Safety

Annual gas safety certificate (CP12)

Electrical Safety

EICR every 5 years minimum

EPC Rating

Minimum E rating required by law

Planning Permission

C4 use class for 3-6 occupants. Sui Generis for 7+.

Additional Requirements

  • Adequate heating throughout (minimum 18°C in bedrooms, 21°C in living areas)
  • Hot and cold water
  • Adequate ventilation
  • Secure entry systems
  • Waste management facilities

Required Documents

HMO licence application
Gas safety certificate (CP12) — max 12 months old
Electrical Installation Condition Report (EICR) — max 5 years old
Energy Performance Certificate (EPC)
Fire risk assessment
Floor plans/layout of each room
Evidence of completed works (for renewals)
Building insurance certificate
Landlord identity verification
Proof of ownership

Fees & Timeline

Licence Fees

HMO Licence
Contact council for current fees — under consultation for 2025 renewal
Additional Licence
Contact council for current fees — scheme renewal 8 December 2025

Timeline

Licence Processing
8-12 weeks typical
Typical Setup Time
4-8 weeks from application to approval

Camden-Specific Notes

  • Additional licensing scheme expires 8 December 2025 — renewal designated for 2 July 2025
  • Renewed scheme includes minor changes: waste management conditions, reduced-term licences possible
  • Strict room size enforcement with 18-month compliance periods for undersized rooms
  • Purpose-built blocks of 3+ self-contained flats fall under additional licensing instead of mandatory
  • HMO standards PDF available on council website with full requirements

Frequently Asked Questions

What licences are required for HMOs in Camden?
Camden requires the following licences: Mandatory HMO, Additional HMO. Borough-wide additional licensing scheme covering HMOs with 3+ persons from 2+ households. Current scheme expires 8 December 2025.
What are the minimum room sizes in Camden?
Single bedrooms must be at least 6.51 sqm (1 person). Rooms <6.51m² must be vacated within 18 months.. Double bedrooms must be at least 10.22 sqm (2 persons). Rooms <10.22m² for 2 persons reduced to 1 within 18 months..
How much does an HMO licence cost in Camden?
The HMO licence fee in Camden is Contact council for current fees — under consultation for 2025 renewal. Processing typically takes 8-12 weeks typical.
What fire safety requirements apply in Camden?
Smoke alarms on every floor. Heat detectors in kitchens. Fire doors on escape routes (FD30). Fire risk assessment required. Fire safety equipment. Clear escape routes.
What documents are needed for compliance in Camden?
You need the following documents: HMO licence application, Gas safety certificate (CP12) — max 12 months old, Electrical Installation Condition Report (EICR) — max 5 years old, Energy Performance Certificate (EPC), Fire risk assessment, Floor plans/layout of each room, Evidence of completed works (for renewals), Building insurance certificate, Landlord identity verification, Proof of ownership.

Contact & Sources

Council Contact

Camden HMO Licensing Team

hmo@camden.gov.uk

020 7974 5969

Camden Compliance Checklist

Tick off items you already have to see your compliance score.

0/15 completed0%

Licensing

0/3

Safety Certificates

0/4

Property Standards

0/4

Documentation

0/4

Need Help?

Get up to 3 free quotes from verified compliance providers in Camden.

Get Free Quotes →

Providers in Camden

Browse verified compliance providers serving this borough.

View providers →